PECL-2604 · LIC 0398211

Kaybob South 3-11 DSA

Kaybob · Local travel · Dry till, unrestricted access

Class 2
Lab

Actual spend

$312.8K

90% of $348K

Budget variance

-$35.2K

-10.1% vs budget

Drilling cost per metre

$718

Cost per productive hour

$193

-2.7% vs Class 2 median

Metres per productive hour

0.88

156 m over 178 hrs

Analytical spend

$52.1K

96 samples · 8% rush

Consulting spend

$52.7K

284 hours logged

Non-productive time

15%

32 of 210 hrs

Project cost composition

Actual spend by cost class for this project.

Field and context metrics

Boreholes
12
Total metres
156 m
Monitoring wells
4
Productive hours
178
Non-productive hours
32
Average depth
13.0 m
Drilling method
Sonic
Travel classification
Local
Complexity class
Class 2
Project lead
Burton Reid

Budget against actual

By cost category, so the cause of variance is immediately obvious.

Efficiency against benchmark

Compared with the Class 2 illustrative range.

Illustrative benchmark
Cost / productive hour
$193
Class 2 illustrative median
$198
Expected range
$176 - $224
Difference
-2.7% vs median

Winter access, mixed till, 2-4 boreholes

Budget consumed

$312,800 of $348,000

Vertical concentration profile

F3 concentration against Tier 1 criteria, mg/kg.

Borehole depth profile

Completed boreholes by depth interval.

  • 0-3 m26
  • 3-6 m34
  • 6-9 m21
  • 9-12 m12
  • 12 m +5

Analytical requests

eCOC submissions raised against this project.

RequestLaboratorySamplesTurnaroundEstimateStatus
eCOC-4796Bureau Veritas - Edmonton28Regular$14,260Reconciled

Decision status

No decision summary published yet.