Workflow

Summary decision report

Which sites need a decision, why, and what is the likely consequence of each available action?

Sites requiring decision

4

2 due this week

High priority sites

2

Sites with open delineation

2

Lateral or vertical closure unproven

Estimated remediation exposure

$4.8M

Baseline Tier 1 basis

Potential reduction opportunity

$2.3M

Portfolio decision register

Select a site to open its decision report.

Illustrative prioritization
SitePriorityHydrocarbonsMetalsPAHsSalinityDelineationEst. volumeEst. costRecommended next actionStatus

Fox Creek 14-22

SD-0142 · Fox Creek

92ExceedPassReviewExceedOpen to the north-east - 2 endpoints unresolved4,860 m³$1.2MF3 soil vs. eco-contact pathway at BH-04Remediate

Chinchaga 8-30

SD-0139 · Chinchaga

78ReviewPassPassExceedOpen on 3 of 4 boundaries9,420 m³$2.7MSalinity plume open laterally, vertical closure unprovenDelineate

Simonette 2-7

SD-0136 · Simonette

64ExceedPassReviewPassDelineated on all boundaries2,180 m³$690KExceedance driven by an excludable irrigation pathwayRisk-based

Gold Creek 11-4

SD-0131 · Gold Creek

41ReviewPassPassPassDelineated640 m³$208KDissolved F2 stable across four monitoring roundsMonitor

Wapiti 6-19

SD-0128 · Wapiti

12PassPassPassPassDelineated--All analyte groups below Tier 1 criteriaClosure ready

Fox Creek 14-22 decision report

SD-0142 · Fox Creek · updated Aug 18, 2026

Remediate

F3 soil vs. eco-contact pathway at BH-04

Analyte group status

  • HydrocarbonsExceedance

    3.40× Tier 1 criteria

  • MetalsPass

    0.42× Tier 1 criteria

  • PAHsReview

    0.96× Tier 1 criteria

  • SalinityExceedance

    1.80× Tier 1 criteria

Delineation and extent

Lateral extent
Open to the north-east - 2 endpoints unresolved
Vertical closure
Closed at 7.5 m (F3 < guideline)
Controlling pathway
Eco direct contact / soil-to-groundwater
Controlling analytes
Hydrocarbons, PAHs, Salinity

Site priority

What contributes to this site's priority.

Illustrative prioritization

92/100

Site priority

  • Exceedance severity+33
  • Controlling analytes+17
  • Open lateral or vertical delineation+14
  • Sensitive pathway or endpoint+18
  • Estimated remediation volume+8
  • Decision uncertainty+3

Decision confidence

High
  • Data completenessHigh
  • Delineation completenessMedium
  • Laboratory evidenceHigh
  • Unresolved endpointsMedium
Illustrative confidence

Vertical concentration and closure

F3 concentration against Tier 1 criteria with depth, mg/kg.

Remediation volume scenarios

Estimated volume and cost for each defensible scenario.

Illustrative scenarios
  • Tier 1 - all pathways · Current controlling case$1.2M
  • Tier 2 - eco contact refined · Requires site-specific soil texture$842K
  • Tier 2 - irrigation excluded · Defensible; no irrigation licence on quarter$664K
  • Risk-based management · Requires regulator engagement$386K

Remediate

$1.2M

Estimated cost

Timeline
Q1 2027, 9 weeks on site
Confidence
High

Key assumption: Tier 1 exceedance shell, all pathways retained

Further delineation

$186K

Estimated cost

Timeline
Q4 2026, 3 weeks on site
Confidence
Medium

Key assumption: Two open north-east endpoints closed with 6 step-out boreholes

Risk-based evaluation

$386K

Estimated cost

Timeline
Q1 2027, regulator dependent
Confidence
Low

Key assumption: Eco contact pathway refined with site-specific soil texture

Potential cost reduction

Baseline remediation against the lowest defensible scenario for this site.

Illustrative scenarios

Baseline remediation estimate

$1.2M

Tier 1 - all pathways

Lowest defensible scenario

$386K

Risk-based management

Potential difference

$854K

69% below baseline