Workflow
Summary decision report
Which sites need a decision, why, and what is the likely consequence of each available action?
Sites requiring decision
4
High priority sites
2
Sites with open delineation
2
Estimated remediation exposure
$4.8M
Potential reduction opportunity
$2.3M
Portfolio decision register
Select a site to open its decision report.
| Site | Priority | Hydrocarbons | Metals | PAHs | Salinity | Delineation | Est. volume | Est. cost | Recommended next action | Status |
|---|---|---|---|---|---|---|---|---|---|---|
Fox Creek 14-22 SD-0142 · Fox Creek | 92 | Exceed | Pass | Review | Exceed | Open to the north-east - 2 endpoints unresolved | 4,860 m³ | $1.2M | F3 soil vs. eco-contact pathway at BH-04 | Remediate |
Chinchaga 8-30 SD-0139 · Chinchaga | 78 | Review | Pass | Pass | Exceed | Open on 3 of 4 boundaries | 9,420 m³ | $2.7M | Salinity plume open laterally, vertical closure unproven | Delineate |
Simonette 2-7 SD-0136 · Simonette | 64 | Exceed | Pass | Review | Pass | Delineated on all boundaries | 2,180 m³ | $690K | Exceedance driven by an excludable irrigation pathway | Risk-based |
Gold Creek 11-4 SD-0131 · Gold Creek | 41 | Review | Pass | Pass | Pass | Delineated | 640 m³ | $208K | Dissolved F2 stable across four monitoring rounds | Monitor |
Wapiti 6-19 SD-0128 · Wapiti | 12 | Pass | Pass | Pass | Pass | Delineated | - | - | All analyte groups below Tier 1 criteria | Closure ready |
Fox Creek 14-22 decision report
SD-0142 · Fox Creek · updated Aug 18, 2026
F3 soil vs. eco-contact pathway at BH-04
Analyte group status
- HydrocarbonsExceedance
3.40× Tier 1 criteria
- MetalsPass
0.42× Tier 1 criteria
- PAHsReview
0.96× Tier 1 criteria
- SalinityExceedance
1.80× Tier 1 criteria
Delineation and extent
- Lateral extent
- Open to the north-east - 2 endpoints unresolved
- Vertical closure
- Closed at 7.5 m (F3 < guideline)
- Controlling pathway
- Eco direct contact / soil-to-groundwater
- Controlling analytes
- Hydrocarbons, PAHs, Salinity
Site priority
What contributes to this site's priority.
92/100
Site priority
- Exceedance severity+33
- Controlling analytes+17
- Open lateral or vertical delineation+14
- Sensitive pathway or endpoint+18
- Estimated remediation volume+8
- Decision uncertainty+3
Decision confidence
High- Data completenessHigh
- Delineation completenessMedium
- Laboratory evidenceHigh
- Unresolved endpointsMedium
Vertical concentration and closure
F3 concentration against Tier 1 criteria with depth, mg/kg.
Remediation volume scenarios
Estimated volume and cost for each defensible scenario.
- Tier 1 - all pathways · Current controlling case$1.2M
- Tier 2 - eco contact refined · Requires site-specific soil texture$842K
- Tier 2 - irrigation excluded · Defensible; no irrigation licence on quarter$664K
- Risk-based management · Requires regulator engagement$386K
Remediate
$1.2M
Estimated cost
- Timeline
- Q1 2027, 9 weeks on site
- Confidence
- High
Key assumption: Tier 1 exceedance shell, all pathways retained
Further delineation
$186K
Estimated cost
- Timeline
- Q4 2026, 3 weeks on site
- Confidence
- Medium
Key assumption: Two open north-east endpoints closed with 6 step-out boreholes
Risk-based evaluation
$386K
Estimated cost
- Timeline
- Q1 2027, regulator dependent
- Confidence
- Low
Key assumption: Eco contact pathway refined with site-specific soil texture
Potential cost reduction
Baseline remediation against the lowest defensible scenario for this site.
Baseline remediation estimate
$1.2M
Tier 1 - all pathways
Lowest defensible scenario
$386K
Risk-based management
Potential difference
$854K
69% below baseline